| Military Pedestrian Suspension Bridge |
|
Objective: To enhance effectiveness in the application of the DN-III-E Plan “Support to civil population in case of disaster”, about restoring affected means of communication (roads) though the use of the following innovative proposals.
Front view of the suspension bridge from the inside.Establishment of a dismountable Military Pedestrian Suspension Bridge, that through a special designed structuring and a constructive procedure, can be mounted and dismounted by hand without heavy machinery, it can be mounted from 48 to 72 hours, depending on weather conditions and land configuration; it can be easily transported on a truck, the bridge can cover distances from 10 to 100 m. by adding or removing modules. |
| Last Updated on Thursday, 14 June 2012 17:15 |